Inter-American Development Bank
facebook
twitter
youtube
linkedin
instagram
Abierto al públicoBeyond BordersCaribbean Development TrendsCiudades SosteniblesEnergía para el FuturoEnfoque EducaciónFactor TrabajoGente SaludableGestión fiscalGobernarteIdeas MatterIdeas que CuentanIdeaçãoImpactoIndustrias CreativasLa Maleta AbiertaMoviliblogMás Allá de las FronterasNegocios SosteniblesPrimeros PasosPuntos sobre la iSeguridad CiudadanaSostenibilidadVolvamos a la fuente¿Y si hablamos de igualdad?Home
Citizen Security and Justice Creative Industries Development Effectiveness Early Childhood Development Education Energy Envirnment. Climate Change and Safeguards Fiscal policy and management Gender and Diversity Health Labor and pensions Open Knowledge Public management Science, Technology and Innovation  Trade and Regional Integration Urban Development and Housing Water and Sanitation
  • Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer

Energía para el Futuro

  • HOME
  • CATEGORIES
    • Energy Access
    • Energy Efficiency
    • Energy Integration
    • Gender and Energy
    • Renewable Energy
  • authors
  • English
    • Spanish

Improving Rural Electrification in Suriname

January 10, 2017 por Roger Sallent Leave a Comment


suriname
Amerindian opening ritual with the President of the Republic of Suriname, H.E. Desiré Delano Bouterse, EBS Management and community representatives.

For decades, a high-voltage transmission line has passed through the Amerindian village of Powakka, located in the district of Para in Suriname, without benefiting the community. The 161kV transmission line transports to Paramaribo the electricity generated by the Afobaka Hydropower Plant, historically the country’s main source of electricity. However, the village never had a 24-hour formal electricity supply service until December 2016. As part of the rural electrification component of the IDB program to improve the sustainability of electricity service, Powakka was officially connected to the power grid in December 2016. The more than 250 households in the community will enjoy the same quality standards of power supply that exist in the capital. In a second phase, expected to be completed by early 2017, the surrounding villages of Carolina, Ayo, Pierre Kondre, Redi Doti and Cassipora will also be connected to the grid, thus increasing the total number of beneficiaries to more than 600 households.

The program was approved in November 2013 for a total amount of US$ 30 million and is being executed by the local power utility N.V. Energie Bedrijven Suriname (EBS). The operation contributes to the sustainability of the power sector by financing: the implementation of Supervisory Control and Data Acquisition (SCADA), Enterprise Resource Planning (ERP) and Geographic Information System (GIS) platforms to strengthen EBS’ operational procedures and corporate performance; rural electrification interventions in the interior of Suriname; and the upgrade of specific infrastructure critical for the proper functioning of the grid.

The President of the Republic of Suriname Desiré Delano Bouterse, ministers, government officials and local traditional authorities attended the opening ceremony for the program on December 21st.

 

suriname2
Citizens attend the opening ceremony for the project.

Powakka, Carolina, Ayo, Pierre Kondre, Redi Doti and Cassipora are located 50km south of Paramaribo and are easily accessible by road. Black water creeks and white savannah sands make this area a popular destination for recreational purposes. Several resorts offer swimming areas and facilities that attract citizens from Paramaribo and tourists taking weekend trips. In addition to tourism, agriculture is another important source of income for the region, and the pineapples are one of its distinctive products. The villages currently have access to an informal power supply via small diesel generators. However, in the best case scenario power is limited to only few hours per day, which unfortunately is the common situation of most villages in the interior of Suriname.

suriname3
Overview of the project

The project has a US$ 7.5 million budget and includes the retrofit of the southernmost EBS substation located at Paranam, the installation of a new 16km overhead transmission line at 33kV between Paranam and Powakka, the construction of a new substation at Powakka along Afobakkaweg road, and the upgrade of the existing distribution system to supply the villages with 36km of 12kV distribution lines. Once completed, the beneficiary communities will be connected to the Paramaribo Electricity System (EPAR), the power grid that serves Paramaribo and surrounding areas. EBS designed the concrete poles used for the transmission line and they were manufactured locally. The project also includes the extension of the EBS fiber optic network in order to allow the remote operation of substations from Paramaribo via SCADA.

suriname4
New substation in Powakka.

This represents an important milestone for the development of the region and follows the completion of the new Carolina Bridge, an important infrastructure project that links both sides of the Suriname River. The rural electrification project will have a positive socio-economic impact on the area by providing more reliable electricity service. In order to assess the impact of the formal power supply on beneficiary households and villages, the project includes an extensive Impact Evaluation that will measure the average impact of the project on a variety of outcomes related to consumption, income, households business performance, agriculture, subjective welfare, health, time use, wealth, and migration. This information will be very valuable for future rural electrification projects in the country.


Filed Under: Español, Uncategorized

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Follow Us

Subscribe

Search

Energy

A blog about the impact of renewables, technology and innovation in the energy industry.

Recent Posts

  • The Challenge of Renewable Energy Curtailment
  • Exploring Dual-Use PV: Unlocking Renewable Energy’s Hidden Potential
  • Energy development lights up the Honduran Moskitia
  • Five Takeaways from Advancing Inclusive Energy Transition in Latin America and the Caribbean in 2024
  • The Importance of Resilient Infrastructure in Addressing Climate Change

Categories

  • covid-19
  • Digitalization
  • Electromobility
  • Energy Access
  • Energy Efficiency
  • Energy Integration
  • Energy transition
  • English
  • English
  • Español
  • Gender and Energy
  • Green hyrdrogen
  • Infraestructura sostenible
  • Minerals
  • Renewable Energy
  • Sin categorizar
  • Uncategorized

Footer

Banco Interamericano de Desarrollo
facebook
twitter
youtube
youtube
youtube

    Blog posts written by Bank employees:

    Copyright © Inter-American Development Bank ("IDB"). This work is licensed under a Creative Commons IGO 3.0 Attribution-NonCommercial-NoDerivatives. (CC-IGO 3.0 BY-NC-ND) license and may be reproduced with attribution to the IDB and for any non-commercial purpose. No derivative work is allowed. Any dispute related to the use of the works of the IDB that cannot be settled amicably shall be submitted to arbitration pursuant to the UNCITRAL rules. The use of the IDB's name for any purpose other than for attribution, and the use of IDB's logo shall be subject to a separate written license agreement between the IDB and the user and is not authorized as part of this CC- IGO license. Note that link provided above includes additional terms and conditions of the license.


    For blogs written by external parties:

    For questions concerning copyright for authors that are not IADB employees please complete the contact form for this blog.

    The opinions expressed in this blog are those of the authors and do not necessarily reflect the views of the IDB, its Board of Directors, or the countries they represent.

    Attribution: in addition to giving attribution to the respective author and copyright owner, as appropriate, we would appreciate if you could include a link that remits back the IDB Blogs website.



    Privacy Policy

    Derechos de autor © 2025 · Magazine Pro en Genesis Framework · WordPress · Log in

    Banco Interamericano de Desarrollo

    Aviso Legal

    Las opiniones expresadas en estos blogs son las de los autores y no necesariamente reflejan las opiniones del Banco Interamericano de Desarrollo, sus directivas, la Asamblea de Gobernadores o sus países miembros.

    facebook
    twitter
    youtube
    This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser.
    To learn more about cookies, click here
    X
    Manage consent

    Privacy Overview

    This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
    Necessary
    Always Enabled
    Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
    Non-necessary
    Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
    SAVE & ACCEPT