Inter-American Development Bank
facebook
twitter
youtube
linkedin
instagram
Abierto al públicoBeyond BordersCaribbean Development TrendsCiudades SosteniblesEnergía para el FuturoEnfoque EducaciónFactor TrabajoGente SaludableGestión fiscalGobernarteIdeas MatterIdeas que CuentanIdeaçãoImpactoIndustrias CreativasLa Maleta AbiertaMoviliblogMás Allá de las FronterasNegocios SosteniblesPrimeros PasosPuntos sobre la iSeguridad CiudadanaSostenibilidadVolvamos a la fuente¿Y si hablamos de igualdad?Home
Citizen Security and Justice Creative Industries Development Effectiveness Early Childhood Development Education Energy Envirnment. Climate Change and Safeguards Fiscal policy and management Gender and Diversity Health Labor and pensions Open Knowledge Public management Science, Technology and Innovation  Trade and Regional Integration Urban Development and Housing Water and Sanitation
  • Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to footer

Energía para el Futuro

  • HOME
  • CATEGORIES
    • Energy Access
    • Energy Efficiency
    • Energy Integration
    • Gender and Energy
    • Renewable Energy
  • authors
  • English
    • Spanish
    • Portuguese

The Challenge of Renewable Energy Curtailment

February 14, 2025 por Arturo D. Alarcón - Martha Carvalho Leave a Comment


Indeed, everyone has seen the image of a hydroelectric power plant releasing millions of cubic meters of water through its spillway. But why does this happen? Usually, it’s due to an excess flow not anticipated in operational planning or electrical system constraints.

The term “curtailment” has recently been used to describe what happens in solar and wind power plants when they must limit their energy generation due to a lack of transmission capacity or operational restrictions. The metaphor suggests that we are ‘wasting’ sun and wind by restricting generation and being unable to harness all the energy, letting it continue its course in nature without being utilized.

How Much Energy Is Not Being Used?

Curtailment of energy in wind and solar power plants is not a new issue. This process occurs in several countries where the growth of these energy sources has not been matched by a proportional increase in transmission capacity and/or when demand does not keep up with electricity generation.

For example, in the United Kingdom, limitations on energy generation began about 15 years ago. Currently, nearly 20% of the wind energy generated in the north is not utilized due to transmission restrictions to the south, where the main demand centers are concentrated. The California Interconnected System (CAISO) has experienced increased energy generation constraints since 2019, mainly from solar sources. In 2022 alone, 2.4 TWh of solar and wind power generation was curtailed, representing a 63% increase compared to 2021 due to transmission system limitations.

This issue is gaining relevance in Latin America and the Caribbean, particularly in countries that have implemented successful policies to promote solar and wind development but have not developed the transmission system at the same pace. In Chile, curtailment represented 9.72% of net renewable generation in 2023; in the first quarter of 2024, it had already reached 18.7%. In Brazil, generation curtailment reached about 10% for wind energy and 17% for solar energy in December 2024, with an upward trend.

Who Bears the Cost of Unused Energy?

Generation curtailment costs the system because the energy not generated by renewable plants—by definition, zero marginal cost energy—must be supplied to the system by other sources (usually thermal or reservoir hydropower, which has a cost above zero) to meet demand needs.

Beyond the additional generation cost, the question arises: Who should bear the cost of the unutilized energy? This depends on regulatory arrangements. It could be the power plant owner or the system losing revenue directly. In some countries, the market compensates plants for the energy that could not be generated if the curtailment was due to system limitations, a cost ultimately passed on to users.

For instance, generator compensation is granted in Brazil only when curtailment occurs due to transmission system unavailability exceeding a certain number of hours defined annually. The Brazilian market does not compensate generators if generation is limited for system reliability needs or because generation exceeds demand. Financial compensation for Latin America’s wind and solar energy curtailment is still under development. Except for Brazil, where a defined regulation already exists, other countries in the region have not yet established precise mechanisms for this compensation.

This issue needs detailed analysis, as regulatory decisions related to curtailment compensation can influence the viability of renewable energy investments, impacting financial flows and developers’ risk perception.

How to Solve Curtailment, and to What Extent?

Energy generation constraints can be technically mitigated through various strategies that involve infrastructure expansion and regulatory adjustments to achieve a better balance between supply and demand. Key strategies include:

  • Increasing transmission capacity from generation to demand centers. Although this would be the “ideal” technical solution, it may not be immediate due to the time required for permits and construction. Capacity can also be increased by changing conductors (reconductoring) or using technologies that allow increased flows in existing networks (Grid Enhancing Technologies), which generally take less time to implement than a new line.
  • Energy storage also offers a solution during periods of high generation, making energy available during peak demand hours. Hybrid projects (generation and storage as a single investment) or stand-alone storage projects operating in a market can be viable. For the latter, regulations must allow for arbitrage or provide incentives for flexibility.
  • Demand-side management encourages demand to use the energy that would otherwise be curtailed, for example, in energy-intensive industries, data centers, and thermal storage that can respond to price signals. It is crucial to implement demand response mechanisms not only for large consumers but also for low-voltage users. This requires developing adequate market designs and investing in smart meters that facilitate real-time consumption integration and optimization.
  • Trading surplus energy in neighboring markets: When generation exceeds demand, energy trading with neighboring countries could accommodate surpluses, reducing curtailment. For example, in CAISO, the real-time market allows participants outside the system to buy and sell energy to balance supply and demand. In 2022, these transactions avoided over 10% of curtailment. Implementing this solution requires regulatory arrangements and interconnection infrastructure.

From a planning perspective, it is possible to identify an optimal level of curtailment, considering the total system cost. In some cases, it may be more efficient from a global optimal perspective to allow a certain degree of generation curtailment rather than excessively oversizing the transmission infrastructure, which would result in a higher system cost. Determining this level requires detailed studies and adjustments in market design that do not jeopardize renewable energy investments, as previously mentioned.

This Is Just the Beginning

Energy curtailment is an issue that cannot be ignored in Latin America and the Caribbean. Countries like Chile and Brazil are already showing significant figures, reflecting that the accelerated growth of renewable energies has not been matched by proportional transmission expansion or adequate regulatory adjustments. Countries adopting wind and solar development strategies will face similar challenges in the coming years.

Addressing this challenge will require building more transmission infrastructure and exploring solutions like storage, flexibility in supply and demand, and Grid-Enhancing Technologies. Each of these strategies requires improved long-term planning to anticipate the expansion of transmission and/or storage and regulatory and market model adjustments to provide the right incentives.

The final challenge will be balancing the cost of expanding the grid and the acceptable level of curtailment for the system. This will force us to reflect on how we plan our networks and regulate markets, ensuring that investments are viable and that we can fully harness the region’s enormous renewable potential.


Filed Under: Uncategorized

Arturo D. Alarcón

Arturo D. Alarcón is a Senior Specialist in the Energy Division of the Inter-American Development Bank (IDB) in Washington, D.C. Since joining the Bank in 2010, he has been involved in the development and oversight of projects related to generation, transmission, distribution, rural electrification, and alternative energies throughout the region. Currently, he supports the technical coordination of the Division, focusing on the expansion of transmission, a just and sustainable energy transition, and decarbonization. He also serves as the focal point for hydropower within the IDB. Arturo holds a Ph.D. in Electrical Engineering, specializing in electric system planning, and a master's degree in Power Systems and Business, both from the University of Strathclyde in Glasgow, UK. Additionally, he is a graduate in Electromechanical Engineering from the Universidad Privada Boliviana. Before joining the IDB, he worked as a researcher at the Energy and Environment Institute at the University of Strathclyde, developing new planning methods for renewable and distributed generation, smart grids, energy storage, and power systems.

Martha Carvalho

Martha Carvalho has 16 years of experience in the energy industry, focusing on electricity. Her expertise spans the generation, transmission, and distribution segments and includes work in fast-growing Latin American markets, especially those with high shares of renewable energy. Martha is currently an Energy Consultant at the Inter-American Development Bank (IDB). In this institution, she supports the origination, preparation, and execution of infrastructure financing operations and loans, enabling the design and implementation of public policies. Martha holds a M. Sc. degree in Energy Systems from the Federal University of Rio de Janeiro and is currently pursuing a D. Sc. degree in the same field. Before joining the IDB, Martha was the Head of Transmission and Distribution Studies at the international consultancy PSR. In PSR, she led a multidisciplinary team, executed projects in various technical areas, delivered transaction advisory, and supported public institutions in developing regulations and policies. Martha also acted as a professor in MBA courses.

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Follow Us

Subscribe

Search

Energy

A blog about the impact of renewables, technology and innovation in the energy industry.

Recent Posts

  • The Challenge of Renewable Energy Curtailment
  • Exploring Dual-Use PV: Unlocking Renewable Energy’s Hidden Potential
  • Energy development lights up the Honduran Moskitia
  • Five Takeaways from Advancing Inclusive Energy Transition in Latin America and the Caribbean in 2024
  • The Importance of Resilient Infrastructure in Addressing Climate Change

Categories

  • covid-19
  • Digitalization
  • Electromobility
  • Energy Access
  • Energy Efficiency
  • Energy Integration
  • Energy transition
  • English
  • English
  • Español
  • Gender and Energy
  • Green hyrdrogen
  • Infraestructura sostenible
  • Minerals
  • Renewable Energy
  • Sin categorizar
  • Uncategorized

Footer

Banco Interamericano de Desarrollo
facebook
twitter
youtube
youtube
youtube

    Blog posts written by Bank employees:

    Copyright © Inter-American Development Bank ("IDB"). This work is licensed under a Creative Commons IGO 3.0 Attribution-NonCommercial-NoDerivatives. (CC-IGO 3.0 BY-NC-ND) license and may be reproduced with attribution to the IDB and for any non-commercial purpose. No derivative work is allowed. Any dispute related to the use of the works of the IDB that cannot be settled amicably shall be submitted to arbitration pursuant to the UNCITRAL rules. The use of the IDB's name for any purpose other than for attribution, and the use of IDB's logo shall be subject to a separate written license agreement between the IDB and the user and is not authorized as part of this CC- IGO license. Note that link provided above includes additional terms and conditions of the license.


    For blogs written by external parties:

    For questions concerning copyright for authors that are not IADB employees please complete the contact form for this blog.

    The opinions expressed in this blog are those of the authors and do not necessarily reflect the views of the IDB, its Board of Directors, or the countries they represent.

    Attribution: in addition to giving attribution to the respective author and copyright owner, as appropriate, we would appreciate if you could include a link that remits back the IDB Blogs website.



    Privacy Policy

    Derechos de autor © 2025 · Magazine Pro en Genesis Framework · WordPress · Log in

    Banco Interamericano de Desarrollo

    Aviso Legal

    Las opiniones expresadas en estos blogs son las de los autores y no necesariamente reflejan las opiniones del Banco Interamericano de Desarrollo, sus directivas, la Asamblea de Gobernadores o sus países miembros.

    facebook
    twitter
    youtube
    This site uses cookies to optimize functionality and give you the best possible experience. If you continue to navigate this website beyond this page, cookies will be placed on your browser.
    To learn more about cookies, click here
    X
    Manage consent

    Privacy Overview

    This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
    Necessary
    Always Enabled
    Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
    Non-necessary
    Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
    SAVE & ACCEPT